Load Shedding Schedule for Polokwane, Limpopo

The Latest Load Shedding Schedule for Polokwane Stages 1 & 2, Stages 3 & 4, Stages 5 & 6 and Stages 7 & 8. You can download the latest Load Shedding Schedule for Polokwane to your computer or mobile phone today!.

Eskom has reimplemented load shedding and by checking your daily schedule it helps you prepare for the load shedding cuts. Due to both planned and unplanned maintenance, Eskom has been forced to implement a series of rolling rotational cuts – much to the frustration of citizens and the economy at large.

Unfortunately for the average citizen and companies, the inevitably of these load shedding cuts prove to be disrupting and frustrating and thus the only solution is to be well prepared.

Click to enlarge the image or to download the Load Shedding Schedule Stage 1 & 2


Click to enlarge the image or to download the Load Shedding Schedule Stage 3 & 4


Click to enlarge the image or to download the Load Shedding Schedule Stage 5 & 6


Click to enlarge the image or to download the Load Shedding Schedule Stage 7 & 8

What is Load Shedding and Why is it necessary

Load shedding is done countrywide as a controlled option to respond to unplanned events to protect the electricity power system from a total blackout.

Unplanned events can vary from unplanned and planned maintenance to a shortage of coal used to power our power stations. Load Shedding is then implemented to prevent countrywide blackouts and the total collapse of the electric power system.